Corporate & Nonprofit
DESIGN TEAM: Van Zelm Engineers l CONSTRUCTION MANAGER: Gateway Energy Group l PROJECT AMOUNT: $2.1M
Fabrication and installation of a “combined heat and power plant” (CHP) enhanced the efficiency of the office tower’s heating and cooling systems.
DESIGN TEAM: Van Zelm Engineers
CONSTRUCTION MANAGER: Gateway Energy Group
PROJECT AMOUNT: $2.1M
Fabrication and installation of a “combined heat and power plant” (CHP) enhanced the efficiency of the office tower’s heating and cooling systems.
DESIGN TEAM: FLAD Architects and WSP Corporation l CONSTRUCTION MANAGER: Turner Construction Company l PROJECT AMOUNT: $8.2M
D.P. Wolff installed the plumbing for a new 111,000 square foot R&D building and two existing research buildings.
DESIGN TEAM: FLAD Architects and WSP Corporation
CONSTRUCTION MANAGER: Turner Construction Company
PROJECT AMOUNT: $8.2M
D.P. Wolff installed the plumbing for a new 111,000 square foot R&D building and two existing research buildings.
D.P. Wolff was retained following a major construction renovation of HVAC systems to commission all systems and provide preventive maintenance and service for all equipment. Our continued service ensures optimum operation of facilities, including the well-utilized natatorium.
D.P. Wolff has a long-term relationship with The Children’s Village, providing services to all locations throughout the New York metropolitan area, including residential housing units, recreational facilities, classrooms, administrative offices and more.
D.P. Wolff, Inc. l 2 Westchester Plaza, Suite 160 l Elmsford, NY 10523 l (914) 767-0515 l (914) 767-3596 fax
24-HOUR EMERGENCY SERVICE (914) 767-0515
D.P. Wolff, Inc.
2 Westchester Plaza, Suite 160
Elmsford, NY 10523
(914) 767-3596 fax
24-HOUR EMERGENCY SERVICE